Unlock a Free Gift
Spend more, get more! FREE T-Shirt at $250 — or upgrade to a Hoodie at $500 instead.
Uzin PE 460 2 part Moisture Barrier 100% RH 10kg kit
Epoxy primer for damp or weak substrates, with coloured components to indicate when mixedMore info
– Reduced odour during application
– High barrier effect against moisture
– Very good surface penetration
– Resistant against water, frost and chemicals
– System component in PAH renovation
$449.00
Payment Methods:
Standard Delivery
QLD, NSW, VIC Metro: 2 - 6 business days
NT, SA, WA, TAS & Regional: 5 - 15 business days
Express Delivery
QLD, NSW, VIC Metro: 1 - 3 business days
NT, SA, WA, TAS & Regional: 3 - 7 business days
*Dispatch: Same day Monday - Friday 8am - 3pm. Friday cut off 2pm if stock available. If stock unavailable you will be contacted right away between above times.
Additional information
| Weight | 10 kg |
|---|---|
| Brand | UZIN UTZ |
| Shelf life | Min. 12 months |
| Mixing ratio | A:B = 100:50 parts per weight |
| Consumption | 200 – 600 g/m² per layer* |
| Working time | 25 – 30 minutes* |
| Pot life | 25 – 30 minutes* |
| Minimum application temperature | 10 °C at ground level and +3 °C above dew point |
| Final strength | after 3 – 5 days* |
Shipping & Delivery
Pick up
Pick up at our main store or from many different depots around Australia.
Post & Freight
Local Couriers or General post straight to your door
Local or regional
Local delivery by one of our vehicles or we will arrange one close to you
More about the product
Main application field
– Barrier primer on unheated cementitious screeds or on concrete up to 98 % R. H.** (5 CM-%)
– Barrier primer on heated constructions up to 90 % R. H.** (3 CM-%)
– Hardener for weak, porous or cracked substrates
– Bonding primer prior to installation with UZIN levelling compounds
Suitable on/for
– Dense or absorbent existing substrates
– Cement or gypsum screeds, magnesia or xylolite screeds, concrete, P4 – P7 and OSB 2 – OSB 4 boards or precast screeds
– On existing or ungritted mastic asphalt
– Ceramic or natural stone floors, terrazzo, metal (contact UZIN Technical Service for advise), matt-sanded coatings and sealants
– Gritbinded or in connection with UZIN PE 280 prior to in stallation with UZIN cement or calcium sulphate levelling compounds
– Exposure to castor wheels in accordance with DIN EN 12 529
– Suitable for residential, commercial and industrial areas
Extended applications
– EP levelling compound when mixed with UZIN Perlsand 0.8 or quartz powder mix
– EP mortar when mixed with special filler UZIN XS 3.2, strength class SR-C35-F10 according to DIN EN 13 813
– Primer prior to bonding work with epoxy-, PUR- or silane-based adhesives
Substrate preparation
The substrate must be sound, load-bearing, dry, free from cracks and free from materials (dirt, oil, grease) that would impair adhesion. Test the substrate in accordance with ap plicable standard or notices and report any deficiencies. Any adhesion-reducing or unstable layers, e.g. release agents, loose adhesives, compounds, covering or paint residues, etc. must be removed, e.g. by brushing, abrading, grinding or shot-blasting. Dense, smooth and metal sur faces should be degreased and abraded. On metal, pre-test for adhesion strength. Allow the primer to dry completely. The datasheets for other used products have to be ob served.
Application
1. Before use, allow the combi-cans to come to room temperature. Punch several times through the plastic plug and the floor of the upper container (hardener B). Allow the hardener to drain completely into the lower container (resin A). Remove the empty upper container and thoroughly blend the components with a spiral mixer (A). De cant the mixed material into an oval bucket and mix once again.
2. Immediately apply an even coat of the primer onto the substrate with the UZIN Nylon Fibre Roller (B). On smooth surfaces, it can be spread with a B2 notched trowel and then evenly rolled out. Ensure a fully sealed coat. Pay attention to the limited working time.
3. When the coat is dry to accept foot traffic, but within 48 hours, apply the second coat crosswise. For a visual differentiation between the coats, mix approx.
4. With subsequent application of levelling compounds, the last wet coat has to be gritbinded immediately with UZIN Quartz Sand 0.8 (approx. 3 kg/m²). After curing vacuum thoroughly. 5. In case of using UZIN PE 460 as a moisture barrier and using UZIN PE 280 as a bonding primer on top, the mini mum quantity of UZIN PE 460 has to be 500 g/m² in one layer. 6. Clean tools immediately after use considering the recommended safety measures. Hardened material can only be removed mechanically. When applying the material always wear the recommended safety equipment.
Important notes
A shelf life of 12 months when stored in moderately cool conditions, in the original packaging. Allow containers to come to room temperature before use.
Best applied between 15 – 20 °C, with the floor temperature above 15 °C and relative air humidity below 65%. High temperatures and high air humidity shorten the drying time. Whilst low temperatures and low air humidity lengthen the drying time.
Caution: Epoxy material can become extremely hot after mixing in the container. Therefore use the material immediately, don’t leave the container unattended after mixing and take the bucket outside after use to allow residues to cure.
Two coats are required when using as a moisture barrier up to 98 % R. H.** (5 CM-%).
A surface barrier cannot be applied onto old cement screeds with levelling compound residues or moisture sensitive substrates.
Contact UZIN Technical Service for advice if a moisture barrier is required on cementitious screeds with under floor heating or concrete sole plates are present.
When used over underfloor heating ensure it has been commissioned and fully tested in accordance with the manufactures guidelines.
If installing wooden floors with UZIN reactive resin adhesives directly to the primer this must happen within 48 hours after applying the primer.
For use in PAH decontamination please refer to the de tailed system recommendations and notes on the internet (www.uzin.com).
For use as a levelling compound, allow the primer to dry. Apply the compound within 24 to 36 hours on the cured primer. If this is not possible, blind the wet primer with UZIN Perlsand 0.8. Once cured, remove any loose sand which has not embedded.
Apply epoxy mortar “wet in wet” on the primer.
When used as a screed in interior areas and a layer thickness > 10 mm, proof of fire must be provided by the manufacturer of the screed mortar.
Protect freshly applied epoxy mortar areas from draughts, direct sunlight and sources of heat.
Do not mix partial quantities! When mixed with the UZIN Epoxy Accelerator it will not achieve EC 1 PLUS classification.
Follow the generally acknowledged rules of the trade and technology for the installation of wood flooring and floor covering in respective of the applicable national standards (e.g. EN, DIN, OE, SIA, etc.).
Seals of quality & ecolabels
– Solvent-free
– EMICODE EC 1 PLUS / Very low emission
Composition
Polyamine-hardened epoxy resin.
Protection of the workplace and the environment
Solvent-free. Non flammable. Comp. A: Contains epoxy resin/irritant. Comp. B: Contains amine hardener/corrosive. Both components: May cause irritations or burns to eyes, skin or respiratory system. May cause sensitisation by skin contact. After contact with skin, wash immediately withplenty of water and soap. In case of contact with eyes, rinse im mediately with plenty of water and seek medical advice. Use barrier cream, protective gloves and safety-goggles. In liquid form, ”hazardous to the environment”, therefore do not allow into drains, water courses or landfill. Observe safety information on product label as well as safety data sheet. Once cured, has neutral odour and presents no physiological or ecological risk.
Disposal
Where possible, collect product residues and re-use. Do not allow dispersal into drains, sewers or ground. Empty, scraped and drip-free containers are recyclable. Containers with liquid residue, as well as the liquid product, are classed as Special Waste. Dried product residues are classed as Construction Waste. Therefore collect waste material, mix both components and allow to harden, then dispose as Construction Waste.
Related Products
Products on sale!
Do you want to choose the perfect floor for your next project?
Visit Us: 1/30 Lawrence Drive, Nerang, QLD. Australia

A wide variety of flooring materials and supplies
We have the largest variety of flooring, machinery and installation tools, floor care products, sanding products, sub-floor products and flooring accessories in Gold Coast, Northern NSW & Brisbane. Choose from the numerous types of flooring under the following categories:
Wide product range
We stock all the most popular brands, finishes and styles in the market carefully selected in the last 30 years. All of our products come with a Quality Guarantee and training where required ensuring the products are used to provide the best results.
Plus, we have everything in stock you need to install, sand or coat your flooring, including machinery hire. Whether you’re a flooring installation contractor or a weekend do-it-yourselfer, trust Marques Flooring for all your flooring needs.
Our network
We are the number one resource in Northern NSW, Gold Coast & Brisbane for timber flooring and as we are supply only we also have a trusted network of installation and finishing companies who we are proud to recommend assisting with the on-site labour.
Trust our network of installers to do the installation job on any type of bamboo, cork, laminate, vinyl, timber, hybrid or engineered timber flooring thoroughly, professionally and correctly. Having spent many years in the flooring industry, we work closely with the industry to ensure we can bring you the best flooring experience possible.
Serving all of norther NSW, Gold Coast, Brisbane and further!
With our huge network of freight companies couriers and our own delivery vehicles, we can arrange for flooring and supplies to delivery anywhere in Northern NSW, Gold Coast or Brisbane. No matter the size of your order, we can make sure it arrives safely when you need it.
For everything you could possibly need or want in quality flooring and installation supplies, get in touch with Marques flooring. We are on-call 07 784 665


















